Explore a fire-tube steam boiler and its ancillary equipment. Drag the slider or toggle thermal view to reveal heat losses and savings with Inzonex modular insulation.
| Component | Temp Before | Temp After | Annual Saving | Install Time |
|---|---|---|---|---|
| Safety Valves (2) | +180°C | 45°C | EUR 890 | 4 min |
| Steam Stop Valve | +180°C | 45°C | EUR 870 | 1 min |
| Backside of Boiler | +135°C | 45°C | EUR 8,670 | 10 min |
| CR Pump / Feedwater (2) | +95°C | 45°C | EUR 540 | 3 min |
| Steam Header Flanges (2) | +180°C | 45°C | EUR 320 | 2 min |
| Blowdown / Ball Valves (4) | +95°C | 45°C | EUR 260 | 3 min |
| Manhole (3) | +145°C | 45°C | EUR 630 | 3 min |
| Boiler Door (front) | +135°C | 45°C | EUR 6,390 | 10 min |
| Boiler Metal Frame (6) | +123°C | 45°C | EUR 1,380 | 5 min |
| Total (9 components) | EUR 19,950 | ~90 min |
Our engineers will make a remote survey of your facility at no cost — identify every heat loss point, calculate ROI, and deliver a detailed proposal within 10 business days.
Request Free Assessment